Commissioning
Aventus completed a validation and a re-commissioning exercise to address issues that were discovered when the building was in use. The LTHW and part of the critical CHW networks were validated with subsequent rectification works completed and re-commissioned against the design brief in a full load condition. The associated air systems were commissioned and demonstrated to the client professional team successfully.